Succor System and Failure Indication for the Starter Batteries of Emergency Gensets
Nowadays there are 3 % of missed start-ups of emergency gensets in Italian hospitals every year. The subject of this work is the analysis of the failure to start an emergency genset due to the failure of the batteries. The work is based on ten years statistics of maintenance on hospital facilities. A real case study is here described; measurements were made on a 1000 kVA genset of a hospital to study the real operating conditions of the system. The whole electrical, mechanical and dynamic model of the starter system of a genset is studied.