Green public procurement. Innovation of the built environment production process
The final implementation of the Minimum Environmental Criteria (CAM) for public buildings (Ministerial Decree 11/10/2017), besides having resolutely pushed the design to internalize technical-constructive choices with a more complete and complex environmental and energy profile, induces the operators of the supply chain to a greater and more aware environmental qualification. Although, despite their mandatory nature, the rate of application of CAM is still limited, this results in a strong process innovation.