Mechanized tunnelling

Predicted and observed settlements induced by the mechanized tunnel excavation of metro line C near S. Giovanni station in Rome

This paper deals with the effects induced by the mechanized excavation of Rome metro line C in the area of an old masonry building, the Carducci school. Class A settlements predictions are obtained performing full 3D soil-tunnel-structure interaction numerical analyses, using a simple elastic perfectly plastic soil constitutive model.

Classification of foam and foaming products for EPB mechanized tunnelling based on half-life time

During tunnel excavation with Tunnel Boring Machines (TBMs) and earth pressure balance (EPB) technology, conditioning agents are commonly used to modify the physical and mechanical properties of soils so that they are appropriate for the application of the front-face support pressure during excavation. The consistency of the conditioned soil must be stable during the time necessary to advance and install the lining. Hence, a stability analysis of the injected foams is an important aspect.

© Università degli Studi di Roma "La Sapienza" - Piazzale Aldo Moro 5, 00185 Roma