energy storage system

Design trade-offs and feasibility assessment of a novel one-body, laminated-rotor flywheel switched reluctance machine

In a bid to respond to the challenges being faced in the installation of flywheel-based electric energy storage systems (EESSs) in customer-side facilities, namely high safety, high energy/power densities and low cost, research work towards the development of a novel, one-body, laminated-rotor flywheel, based on a switched reluctance machine (OBOLAR-Fly SR machine) is presented, where the laminated rotor provides both the energy storage and motor/generator functions. The one-body architecture improves compactness and robustness.

A One-Body, Laminated-Rotor Flywheel Switched Reluctance Machine for Energy Storage: Design Trade-Offs

A critical aspect of distributed generation systems focuses on the installation of Electrical Energy Storage Systems in customer-side facilities. In this scenario, flywheel technology is challenged to provide high levels of safety, compactness and competitive cost. This work presents a novel, one-body flywheel scheme based on a switched reluctance machine, whose laminated rotor fulfils both the motor/generator and energy storage functions. The one-body architecture enhances compactness and robustness, whereas the laminated rotor ensures high safety.

A Preliminary Exergy Analysis of the EU DEMO Fusion Reactor

Purpose of the present study is the exergy analysis of EU DEMO pulsed fusion power plant considering the Primary Heat Transfer Systems, the Intermediate Heat Transfer System (IHTS) including the Energy Storage System (ESS) as a first option to ensure the continuity of electric power released to the grid. A second option here considered is a methane fired auxiliary boiler replacing the ESS. The Power Conversion System (PCS) performance is evaluated as well in the overall balance.

Design and analysis of the improved configuration of the secondary circuit for the EU-DEMO power plant

DEMO is planned to be a prototype fusion power plant capable of demonstrating production of electricity at the level of a few hundred MW. DEMO is considered to be an intermediate step between the ITER experimental reactor and a commercial power plant. Design and assessment studies on the European (EU) DEMO are carried out by the EUROfusion consortium. The Primary Heat Transfer System (PHTS) transfers heat from the breeding blanket (BB) and other reactor heat sources (divertor and vacuum vessel) to the secondary circuit.

© Università degli Studi di Roma "La Sapienza" - Piazzale Aldo Moro 5, 00185 Roma